Analisis Setting Over Current Relay dan Ground Fault Relay Pada Sisi Incoming Travo 60 MVA dan OutgoingFeeder

Dasweptia Dasweptia, Yenni Afrida, Dani Ahmad Fauzi

Abstract


A Feeder in the medium-voltage of 20 kV system is used for the electricity distribution from substation to the consumer. But in fact, at the network distbution  there are a many kinds of disturbances, both of phasa to phasa and phasa to ground. So it is very necessary to have a security devices that can be responded quicly, flexibly and reliably. Security devices which used to overcome the problem of over-current disturbance are OCR (Over-Current Relay) and GFR (Ground-Fault Relay). In installating of these relay, it is also set the working time setting, in order to have a coordination to the other relay. From the results of this study obtained that the largest current disturbance of 3Ø, 2Ø and 1Ø located at the network base (1% of channel) is (R,S,T= 6.471A, 3.235A and 286A), while the smallest disturbance current located at the end of the network (100% of channel) is (R,S,T= 400A, 200A and 149A). From this study also found that working time of OCR on the side of outgoing feeder was faster than incoming, the working time of outgoing relay was 0,3 second, then in the incoming side is 0,7 second for the (1% network length). So it can be concluded that the more near distance of disturbance, then the value of the disturbance will be great, and if  the greater current of the disturbances happened then working time of relay will be quickly

Keywords


Feeder, Disturbance, Protection (Relay), OCR, GFR, Setting

Full Text:

PDF

References


Affandi, Irfan. (2009). Tugas Akhir : “Analisa Setting Relai Arus Lebih dan Relai Gangguan Tanah pada Penyulang Sadewa di GI Cawangâ€. Depok : Universitas Indonesia, 2009.

Fajar Pranayuda dkk,( 2012). Analisis Mengenai Penyetelan Proteksi Penyulang Cimalaka di Gardu Induk 70 kV Sumedang, Jurnal Media Elektrika, Vol. 5 No. 2 Desember 2012, Hal 11-26.

Budi Utomo, Heri. Ir. “Modul Perkuliahan :Proteksi Penyulang Tegangan Menengah. Bandung : Politeknik Negeri Bandung, 2004.

Fattahurrahman, Tugas Akhir :“Studi Penyetelan Rele OCR dan GFR pada Perubahan Kapasitas Trafo Daya dari 30MVA menjadi 60MVA akibat Penambahan Beban di Gardu Induk Gumawangâ€. Palembang : Universitas Tridinanti Palembang, 2016.

Sarimun, Wahyudi, (2012), “Proteksi Sistem Distribusi Tenaga Listrikâ€, Penerbit CV.Garamond, Depok.

Y. Afrida, Mahendra Ridho, Hamimi,(2020) Analisa Kegagalan Koordinasi Proteksi Pada Setting Relay OCR Penyulang Semar di PT. PLN (Persero) Unit Layanan Pelanggan Bandar Jaya, Jurnal Ilmiah Teknik Elektro (JITRO), Vol.1.No.1 Oktober 2020.